Industry Guide8 min read
Preventive Maintenance Schedule for Construction Equipment
Keep your excavators, loaders, and heavy equipment running with these sample PM schedules.
Excavator PM Schedule
| Task | Interval |
|---|---|
| Daily inspection & greasing | Every 10 hours |
| Engine oil & filter change | Every 250-500 hours |
| Hydraulic filter change | Every 500 hours |
| Air filter inspection | Every 250 hours |
| Track adjustment check | Every 250 hours |
| Hydraulic oil change | Every 2,000 hours |
| Full service inspection | Every 1,000-2,000 hours |
Wheel Loader PM Schedule
| Task | Interval |
|---|---|
| Daily walkaround & greasing | Every 10 hours |
| Engine oil & filter | Every 250 hours |
| Transmission oil check | Every 250 hours |
| Hydraulic filter | Every 500 hours |
| Tire pressure & condition | Weekly |
| Brake inspection | Every 500 hours |
| Transmission service | Every 1,000 hours |
Tips for Construction Equipment PM
- Track engine hours diligently - this is your primary metric
- Don't skip daily inspections - they catch problems early
- Use quality filters and fluids - cheaper isn't always better
- Document everything - warranty claims require records
- Adjust intervals based on conditions (dusty = more frequent filter changes)